Tuesday, 8 November 2011

Studio design

Today in the afternoon we as a group started to design the studio and put the props and so on were we wanted them to be. This process was very efficient since we a couple weeks ago did the set design which I also blogged about. The set design paper included the props that was needed and where they were supposed to be placed in front of the green screen. After that we decided where the drums and the microphone were going to be placed among the props. Thereafter we talked about the lighting once again to ensure that we will get the effect and look that we are searching for. The lights were then set according to our plans and what have been approved by Dan in the early planning stage. After an hour of putting together everything we were happy with the result and ensured that everything was prepared and ready for tomorrow including the costume of the cast.
Here is a picture of the final result of the imitation of the scrapyard, missing the guitar and the bass and the lighting isn't going to be in the shot.

No comments:

Post a Comment